What to do before your roof replacement: a homeowner’s checklist

Once you’ve decided a replacement is the right call — whether you got there through an inspection, an insurance claim, or a repair conversation that pointed one direction — there’s a short window between that decision and the day the crew shows up. What you do in that window affects how smoothly the job goes and whether you’re positioned well when it’s done.

None of these steps are complicated. Most take less time than you’d expect. But skipping them tends to create problems that are more annoying to solve after the fact than before it.

Step 1: Confirm your insurance scope before signing anything

If your replacement is insurance-related — storm damage, hail, wind — confirm the adjuster’s documented scope in writing before you authorize any work. Specifically, you want to know:

  • Whether your policy is ACV (Actual Cash Value) or RCV (Replacement Cost Value) — this determines whether you’ll receive a second payment after the work is complete
  • What your deductible is and when it’s due
  • Whether the approved scope covers full replacement or only partial work — and if partial, whether your contractor agrees that’s the right scope
  • What documentation your insurer requires before releasing any recoverable depreciation

If your contractor’s assessment of what’s needed doesn’t match the adjuster’s scope, resolve that before work begins — not after. Supplementing a claim is standard practice and your contractor should handle it, but it’s much easier to do before the old roof is gone.

One thing that never changes: if any contractor offers to waive or absorb your deductible as part of the deal, walk away. That’s a violation of Texas Insurance Code Section 707.004, not a negotiating favor.

▸ → Insurance claims walkthrough: Our hail and storm damage guide explains how insurance claims work for roof replacement — including the two-check process and how to handle a low adjuster scope. → /hail-damage-roof-austin/

→ Insurance claims walkthrough: Our hail and storm damage guide explains how insurance claims work for roof replacement — including the two-check process and how to handle a low adjuster scope.

Step 2: Make your shingle selection

Your contractor will present options, but the choice is yours — and it’s worth making deliberately rather than defaulting to whatever’s standard. The two decisions that matter most for Austin homeowners:

Standard architectural vs. impact-resistant. Impact-resistant shingles (Class 3 or Class 4) are tested to withstand hail without cracking and are the most meaningful upgrade available for homes in Central Texas’s hail corridor. Many Texas insurance carriers offer premium discounts for Class 3 or Class 4 products — the discount varies by carrier, but in some cases it offsets a meaningful portion of the cost difference over time. Call your insurance agent before finalizing your shingle selection. It’s a five-minute conversation that can change the math.

Color. Lighter-colored shingles reflect more solar heat than dark ones, which can reduce attic temperatures in Austin summers. If you’re undecided between similar options, energy efficiency is a legitimate tiebreaker in this climate.

Also confirm whether your HOA has restrictions on shingle color or material before you finalize anything. Some Austin-area associations do, and finding out after installation is an expensive problem.

Step 3: Understand the permit

Most full roof replacements in Austin require a permit through the City of Austin Development Services Department. Your contractor should pull the permit — this is standard practice for any reputable company doing permitted work in the city.

You don’t need to manage the permit process yourself. What you should confirm is that your contractor is pulling one. If they tell you it isn’t required, or suggest you’ll save money by skipping it, that’s a red flag. Permitted work is inspected. An inspection protects you — it’s not bureaucratic overhead.

If you’re in a suburb — Pflugerville, Round Rock, Cedar Park, Georgetown, or another municipality in the greater Austin area — permit requirements are set by that municipality’s building department. The process is similar but the specific requirements may differ slightly. Your contractor should know which jurisdiction applies to your address.

Step 4: Prepare your property

Roof replacement is a significant construction event at close range. A few hours of preparation the day before makes a meaningful difference in how the day goes — for the crew and for you.

Outside the house

  • Move vehicles out of the garage and driveway — the crew needs access to stage a dumpster and materials, and vehicles near the work zone are at risk from falling debris
  • Move potted plants, outdoor furniture, grills, and any decorative items away from the perimeter of the house. Shingles and debris fall straight down from the roofline, and clearance of at least six to eight feet around the foundation protects your landscaping and belongings
  • Cover or move any items stored along exterior walls — pool equipment, garden tools, anything that can’t be easily replaced if it takes a direct hit
  • If you have a shared driveway or the crew’s access will affect neighbors, let them know the day before

Inside the house

  • Remove or protect wall hangings, framed photos, and any fragile items near interior walls — the vibration from tear-off and nailing is significant and things do fall
  • Note any attic access points the crew may need — if deck repair is part of the scope, they may need interior access in addition to working from the roof surface
  • Keep pets indoors and away from exterior doors throughout the work day — the noise level is considerable and the activity around the perimeter creates escape opportunities
  • Keep children inside during active work hours

A note on the dumpster

Your contractor will typically place a dumpster in the driveway for debris. Confirm placement the day before if you have specific constraints — a low-clearance garage, a particular section of driveway you need to keep clear, or HOA rules about street placement. It’s much easier to adjust before it arrives than after.

Step 5: Know what to expect on the day

Most Austin residential roofs are completed in a single day. Here’s what that day looks like so you’re not caught off guard by anything.

The crew typically arrives early — often before 7 a.m. — to maximize working hours in Austin’s heat. They’ll lay tarps around the perimeter before tear-off begins. The noise during tear-off is significant and unavoidable; it tapers once the new shingles are going down.

Stay available by phone during the day. If the crew finds deck damage during tear-off — soft or rotted sections of sheathing that weren’t visible before the old roof came off — your contractor will contact you to confirm the scope before proceeding. This is normal and doesn’t indicate a problem with the original estimate; deck condition is genuinely impossible to assess until it’s exposed.

At the end of the day, the crew sweeps the roof surface and runs a rolling magnet through the yard and driveway to collect nails. Plan to do a secondary pass through the yard yourself in the days following — particularly in grass and garden beds, where nails can work their way down out of the initial sweep.

Before the crew leaves, do a walkthrough with the site lead. You should see the completed ridge line, flashing at every penetration, and the cleaned perimeter. If anything doesn’t look right, that’s the time to say so — not a week later.

→ Full replacement guide: Our roof replacement guide covers how to know when it's time to replace, what it costs, and how to choose a contractor.

Frequently asked questions

How much notice do I need to give before the replacement starts?

It depends on scheduling and material availability, but plan for at least a week between signing the contract and the start date. That gives time for the permit to be filed, materials to be ordered and staged, and the crew schedule to be confirmed. In the weeks immediately following a major hail event, lead times can stretch — if you’re in a post-storm market, earlier is better for getting on the schedule.

Do I need to be home during the replacement?

You don’t need to be present all day, but you should be reachable by phone. If the crew discovers deck damage during tear-off, they’ll need authorization before proceeding with repairs beyond the original scope. A walkthrough at completion is also worth being present for — it’s your opportunity to see the finished work and ask questions before the crew leaves.

What happens if it rains on the day of my replacement?

Your contractor will monitor the forecast and contact you if the schedule needs to move. A full replacement shouldn’t begin if meaningful rain is expected during the work day — an exposed deck without underlayment is vulnerable, and wet conditions affect both safety and installation quality. Light morning clouds that clear are different from a storm system moving through; your contractor makes that call. In Austin’s spring storm season, schedule flexibility on both sides is a practical reality.

Should I do anything to my gutters before the replacement?

Clean them if they haven’t been recently — not because it affects the replacement, but because the crew’s magnet sweep works better with clear gutters, and you’ll want them clean to check for granule accumulation in the weeks after the new shingles settle. If your gutters are pulling away from the fascia, let your contractor know before the job starts — fascia repair is sometimes part of a replacement scope and sometimes a separate item, and it’s better to address it while everything is already being done.

How do I document the new roof for my insurance records?

Ask your contractor for a copy of the permit and final inspection documentation, the product data sheet for the shingles installed (including the UL rating if impact-resistant shingles were used), and the warranty registration information for both the material and the labor warranty. Keep these with your home’s records. If you’re carrying Class 3 or Class 4 shingles and your insurer offers a premium discount, you’ll need the product documentation to request it.


Enjoyed the article? 

You can find more great content here:

Hip Roof Maintenance Tips From Experts to Prolong Lifespan

Areas We Serve

We serve Austin and the surrounding Central Texas communities — the same hail belt, the same storm seasons, and the same need for a roofing company that's here year-round, not just when the storms roll through.

Ready to get started?

Free inspection, no down payment, no pressure.

We answer our phone live, and can usually schedule an appointment for within one business day - often sooner.